top of page

Review Constructability

Technical verification for infrastructure teams.

Direct engineering audit of DOT plan sets, bid quantities, and design logic to eliminate errors before submission.

Scope of Audit

Undetected plan errors trigger costly change orders. We audit the technical math and logic to ensure bid accuracy and site success.

Item schedule

Quantity variance

Standard Book Match

Detail Library Conflicts

Utility Clashes

Missing Data Gap

The Deliverable Report

Strictly technical findings. A prioritized log of constructability risks categorized by project impact.

Sample Report

[ID: 042-Q] [SHEET: C-104 / DRAINAGE] [RISK: HIGH]
Conflict between 12-inch Storm Sewer and utility at station 10+54.
Profile clearance is 0.2 feet, failing IDOT standard 542401-01.
0.5-foot minimum clearance is mandatory for this crossing.

Every report serves as a risk ledger, providing the exact engineering standard or detail violated by the design.

Licensing & Technical Stack

Audits are performed by Illinois Licensed Professional Engineers with extensive heavy civil field experience.

Algorithms are mapped to latest Highway standards and local jurisdictional code requirements.

Secure data management utilizing SOC 2 compliant storage for all project documents.

Upload Your Plan Set

Validate every detail before the bid is due.

Project type
Plan phase

24-hour response time. All documentation is secured under strict NDA and confidentiality.

bottom of page